Skip links

Olympia: the 40-metre Perini Navi returns to the water after its Lusben refit

Thirteen years after its construction, Olympia returns to the water with a significant part of its onboard systems completely renewed. The 40-metre sailing yacht, built by Perini Navi in 2013 and previously known as State of Grace, was launched on 5 October at the Lusben shipyard in Viareggio, following an extensive refit programme that involved much of the vessel.

The work went well beyond a conventional yacht upgrade. Lusben, the refit division of the Azimut|Benetti Group, carried out interventions on the engine room, propulsion system, lifting keel and sailing systems. The programme also included the renewal of deck equipment, onboard comfort systems and a complete repaint.

Olympia Lusben

A new balance in the engine room

One of the most demanding parts of the programme concerned the engine room. The main Caterpillar engine was removed from the yacht and underwent a complete overhaul, including replacement of the engine block. New generators were installed, the exhaust system was redesigned and the Selmar system was replaced. To complete the work, the main engine room components were dismantled, inspected and, where necessary, overhauled or replaced.

On a sailing yacht of this size, the engine and onboard systems remain important even when the vessel is sailing under wind power. Auxiliary propulsion, power generation and onboard systems must operate reliably throughout the different phases of use.

It is precisely this relationship between different systems that makes the work carried out on Olympia significant. The refit addressed the technical infrastructure as a whole, rather than simply replacing individual pieces of equipment.

The lifting keel and sailing systems

Alongside the engine room, another important part of the work involved the lifting keel. Lusben carried out a complete overhaul of the centreboard system, working on the hydraulic cylinder and replacing its piston rod. This is a particularly important feature on a sailing yacht. The lifting keel allows the vessel’s draught to be adjusted: when lowered, it contributes to stability while sailing, while raising it reduces the depth of water required beneath the hull. It is a solution that demands a reliable mechanical and hydraulic system, especially on a 40-metre yacht.

The programme also involved deck equipment and sail-handling systems, together with upgrades to the navigation electronics. A new external manoeuvring console was also installed, providing access to the controls during deck operations. These interventions have one thing in common: they concern the way Olympia is handled and used. Their renewal therefore carries an importance that goes beyond routine maintenance.

A refreshed appearance without changing its identity

The refit also addressed Olympia’s exterior appearance. The complete repaint covered the hull, superstructure and underwater hull, as well as the mast and boom. At the same time, onboard comfort systems were upgraded. Unlike a transformation that radically changes a yacht’s lines and volumes, the programme described by Lusben focused primarily on the vessel’s technical and functional renewal.

The work on the exterior surfaces therefore accompanies a more extensive intervention, addressing the systems that allow the yacht to continue sailing and being enjoyed on board. This is an important distinction. In the refit of a sailing yacht, the result is not necessarily measured by what looks different at first glance. A significant part of the work remains hidden within the onboard systems, mechanical equipment and technical installations.

Perini Navi expertise returns to the project

One distinctive aspect of the refit concerns the people involved. Lusben entrusted operational coordination to project managers Nicola Romani and Carlo Cinquini, both of whom have extensive experience gained at Perini Navi. Their knowledge of the original construction solutions made it possible to approach the interventions with a clear understanding of the yacht’s characteristics and to incorporate additional work identified during the programme.

Lusben carried out much of the work directly, while also coordinating specialist suppliers and working closely with Susanna Corsagni, founder of Seamotion and the owner’s representative. This aspect highlights another dimension of refit work. When working on a yacht built more than ten years earlier, understanding the original design and construction decisions can be essential in identifying the most appropriate solutions.

Collaboration between those familiar with the vessel’s history and those responsible for its renewal therefore becomes an integral part of the process.

Returning to the water marks a new phase

Olympia’s launch marks the completion of the main part of the programme, although not all activities have yet been concluded. Following its return to the water, the yacht is now preparing for the reinstallation of its carbon-fibre mast, followed by the final adjustments and checks. For Lusben, Olympia represents another project in the large sailing yacht segment, where complexity depends not only on size but also on the integration of structure, sailing equipment, mechanical systems and onboard operations.

The case of this Perini Navi demonstrates how a refit can extend the life of a yacht by carrying out extensive work on its technical components, without necessarily altering its original character.

Leave a comment